REQUEST FOR QUOTATIONS - HBJTJMA Rt. 147 Waterline Replacement - Herndon Borough

HBJTJMA proposes to use a recently approved Community Development Block Grant to replace water distribution main that brings treated water from the reservoir to the water main and the water main along Route 147 before PennDot completes milling and paving planned for 2024. The following narrative outlines the major responsibilities of the proposers. These responsibilities include the entire project from design to final inspection. It should be recognized by all proposers that the Scope of Services included herewith might exclude some minor, incidental Engineering responsibilities not currently identifiable.

Quotations shall include the attached "Standard Engineering Estimate" and be submitted to:

Linda Sterling, Project Coordinator

SEDA-COG

201 Furnace Road

Lewisburg, PA 17837

All quotations shall be sealed and clearly marked on the outside, "HBJTJMA Engineering Services Quotation," and must be received by January 20, 2023, prevailing time, 3:00 PM, at which time they will be publicly opened at SEDA-COG.

Questions regarding this quotation should be directed to:

Linda Sterling, Project Coordinator

SEDA-COG

201 Furnace Road

Lewisburg, PA 17837

570-238-2878

lsterling@seda-cog.org

 

UPDATE: The following corrections have been made to the attached document on Page 3 -

 

PROJECT AREA

The project area is delineated by the heavy blue line in the attached map.

 

PROJECT DESCRIPTION

                      Water main #1 bringing untreated water from the system well head to its reservoir will not be replaced at this time and should not be part of the engineer’s estimate for this project.

Related Links
Attachment Size
RFQ- Rt 147 Waterline Replacement.pdf 632.59 KB