Marion Heights Stormwater Improvements
Project: Marion Heights Stormwater Improvements
Location: Brunswick Street, Marion Heights Borough, Northumberland County, PA
Solicited by: Tonia Troup, Project Coordinator, SEDA-COG
đ 201 Furnace Road, Lewisburg, PA 17837
đ (570) 524-4491
đ www.seda-cog.org
Project Overview
Marion Heights Borough seeks professional engineering services for stormwater drainage improvements along Brunswick Street. Services include:
-
Full project design
-
Specifications for bidding
-
Construction supervision
-
Compliance with federal and state regulations
Project Scope
-
Stormwater Infrastructure:
-
New inlet boxes at Brunswick & Melrose and Brunswick & Fern
-
Connection to existing inlet at Brunswick & Warsaw
-
-
Accessibility Improvements:
-
Remediation of four curb cuts with truncated domes
-
Removal of architectural barriers
-
Quotation Submission Details
-
Deadline: July 8, 2025, by 11:00 AM (prevailing time)
-
Submission Requirements:
-
Three (3) copies, sealed and clearly marked:
âEngineering Services Quotation â Marion Heightsâ -
Delivered to:
Tonia Troup, SEDA-COG
201 Furnace Road, Lewisburg, PA 17837
OR
Marion Heights Borough Office
224 E North Street, Marion Heights, PA 17832
-
-
Note: Faxed or emailed quotations will not be accepted.
Design & Planning Responsibilities
-
Complete engineering design with construction-ready plans
-
Address all systems impacted by the project
-
Attend up to 4 design meetings and 4 preconstruction/bidding meetings
-
Provide cost estimates at preliminary and final design phases
-
Identify and obtain all required permits (excluding environmental and archaeological reviews)
-
Create a detailed project schedule and timeline
Bidding & Contract Coordination
-
Prepare all bid and contract documents (bid forms, specs, compliance forms)
-
Manage up to 10 bid document distributions
-
Publish advertisements (costs reimbursed by borough)
-
Coordinate bid opening, tabulations, award recommendations
-
Assist the solicitor throughout the contract process
Construction Supervision
-
Conduct regular site visits (as proposed in quotation)
-
Review contractor submittals (samples, shop drawings, etc.)
-
Approve contractor payment applications
-
Attend final inspection and provide âAs Builtâ drawings (both hard copy and electronic)
Additional Engineering Services
-
Prepare required federal/state reports
-
Assist with agency communications for project approvals
Compensation & Payment
-
Contract will be lump sum, including all fees and reimbursables
-
Payment based on percentage completion
-
Payment contingent on DCED funding disbursement
Participation Goals & Compliance
MBE/WBE Goals:
-
MBE: 5%
-
WBE: 3%
Section 3 Compliance (24 CFR Part 75):
-
Applies to construction contracts over $200,000 (not professional services)
-
Engineer expected to support compliance documentation and facilitation
-
Benchmarks:
-
Section 3 labor hours = 25%
-
Targeted Section 3 labor hours = 5%
-
Evaluation Criteria
-
Responsiveness to RFQ
-
Relevant experience & past performance
-
Quality of previous work
-
Resources and timeliness
-
Cost
-
MBE/WBE commitment
Note: Cost is only one of several evaluation factors.
Required Submittals
-
Completed Standard Engineering Estimate
-
Two references from similar projects (within the last 3 years)
-
MBE/WBE Certification (if applicable)
-
Documentation of MBE/WBE outreach (if subcontracting or hiring)
Insurance Requirement
-
Proof of Professional Liability Insurance must be provided, including limits of coverage.