REQUEST FOR QUOTE: Wastewater Treatment Plant Generator
REQUEST FOR QUOTE
Project: Wastewater Treatment Plant Generator
Date Issued: July 24, 2025
Location: Austin Borough, PA
đ 21 Turner Street, Austin, PA 16720
Project Site Address: 92 PA-872, Austin, PA 16720
Overview
Austin Borough is requesting quotes through the PA COSTARS program for the design, fabrication, furnishing, and testing of:
-
One (1) complete 45 kW (53 kVA) propane-fueled generator package
-
One (1) automatic transfer switch
Quotes made outside of the COSTARS program will not be accepted. Quotes must include the vendorâs COSTARS Contract/Vendor number.
Key Requirements & Submission
-
Submission Deadline: August 1, 2025 at 11:00 AM
-
Email Quotes To:
đ§ rreitz@emengineers.com -
Include:
-
Estimated lead times
-
Confirmation that quoted items do not include components listed under section 1.1.3 (work provided by others)
-
Contact for Questions
Ryan Reitz
Project Engineer, E&M Engineers and Surveyors
đ 814-362-5546 ext. 116
đ§ rreitz@emengineers.com
Project Scope
The proposal covers:
Generator Package
-
45 kW propane-fueled engine with weatherproof outdoor enclosure
-
240V, 3-phase, 60 Hz, high-leg delta system
-
NFPA 110 Level 1 compliance
-
Solid-state voltage regulator, brushless excitation
-
Load testing and startup included
-
Stainless steel handrails, exhaust muffler, vibration isolation base
-
Local and remote annunciator panels, control systems, battery charger, and emergency stop
-
One output breaker with ground fault protection
Automatic Transfer Switch
-
200 amp, 240V, 3-phase, outdoor Type 3R
-
Open transition (break-before-make), microprocessor-controlled
-
UL 1008 and UL 1066 compliance
Work Provided by Others (Not to be Quoted)
-
Equipment receiving, unloading, and installation
-
Construction of foundation anchors
-
Generator/transfer switch installation
-
All external wiring and cabling
Submittals Required
-
Compliance statement with deviations clearly listed
-
Technical brochures, outline drawings, shop and certified drawings
-
Generator performance data and wiring diagrams
-
Emissions test reports, ISO 9001 certification, parts availability
Other Requirements
-
Minimum one-day site inspection by Owner
-
Startup testing and operator training
-
Factory and on-site testing
-
One-year minimum warranty from startup (include options for 2- and 4-year extensions)
-
Service contract option to be included
-
Six copies of O&M manuals required
Installation & Operating Conditions
-
Designed for both continuous operation and long periods of inactivity
-
Must meet all local, state, and federal codes including NFPA 70, 110, 37
-
Must function under Austin Boroughâs environmental conditions