The Gate House HVAC and Electrical Upgrades Project – Re-Bid
ADVERTISEMENT FOR BIDS
Project: The Gate House HVAC and Electrical Upgrades Project – Re-Bid
Owner: The Gate House
Engineer: Peters Consultants, Inc.
📍 2701 Columbia Boulevard, Bloomsburg, PA 17815
Bid Submission Details
-
Deadline: October 23, 2025, at 11:00 AM (local time)
-
Submission Options:
-
Online via PennBid
-
Hard copy sealed bids delivered to Peters Consultants, Inc.
-
Mark envelope: “Sealed Bid for The Gate House HVAC and Electrical Upgrades Project – Re-Bid”
-
-
-
Bid Opening: October 23, 2025, at Engineer’s office
-
Review & Award: Bids reviewed by The Gate House; contract award contingent upon SEDA-COG approval for CDBG compliance
Pre-Bid Meeting
-
Date: October 15, 2025
-
Time: 2:00 PM
-
Location: On site at The Gate House, 21 Gatehouse Drive, Danville, PA 17821
-
Attendance: Optional
Project Scope
-
Install a new HVAC system and complete electrical upgrades throughout the building
-
Mechanical Work:
-
12 wall-mounted units with wireless thermostats (all major rooms)
-
Retain existing heating system for backup/supplemental use
-
3 outdoor condenser inverters (1 per floor) with underground piping/electrical connections through basement
-
Concealed infrastructure routed near existing radiator pipes
-
Conceal lines with crown molding around room perimeter; use boxed corners for vertical runs
-
No additional exterior-mounted components
-
-
Electrical Work:
-
Miscellaneous upgrades as specified in Part III, Section 04060 of Contract Documents
-
-
Contracts:
-
Mechanical Construction
-
Electrical Construction
-
If separate contractors are selected, coordination is required
-
-
Completion Timeline:
-
Substantial completion within 45 calendar days of Notice to Proceed
-
Final completion by end of December 2025
-
Contract Documents
-
Online: http://PennBid.Bonfirehub.com
-
Hard Copy: Available from Peters Consultants, Inc. for $45 (+$25 shipping if needed)
-
In-Person Review: Free at Engineer’s office, weekdays 8:00 AM – 4:30 PM
Bid Security & Bonds
-
Bid Bond: 10% of total bid required
-
Upon Award: Contractor must provide required bonds, insurance, and submittals
Labor & Compliance Requirements
-
Davis-Bacon wage rates apply
-
Equal Employment (EO 11246):
-
Female participation goal: 6.9%
-
Minority participation goal: 1% (on-site construction; contracts > $10,000)
-
-
MBE/WBE & Section 3 Requirements:
-
MBE goal: 5%
-
WBE goal: 3% (contracts ≥ $25,000)
-
Section 3 goals (if HUD/CDBG funding > $200,000):
-
25% of labor hours = Section 3 workers
-
5% of labor hours = Targeted Section 3 workers
-
-
Documentation of solicitations/commitments must be submitted with bid
-
Section 3 businesses may receive preference
-
Reservation of Rights
The Gate House may:
-
Hold bids up to 60 days (or as allowed by law)
-
Reject any or all bids
-
Waive irregularities
-
Negotiate contract amounts
Non-Discrimination Statement: The Gate House does not discriminate on the basis of race, color, national origin, sex, religion, age, disability, or familial status.
Issued by:
SEDA-Council of Governments
Contact: Ms. Leslie Hosterman, Project Coordinator